Obumneme U. Process Engineer
8 years experience in Process Engineering design and field operations in the oil and gas industry.
Key Projects
Petroflow/NETCO Limited, Project: EGINA FPSO
Position Process Engineer: Feed HAZOP Close-Out, Modification of BFD,
PFD,UFD,P&ID and U&ID, Process Datasheet (PDS), SPI Process Datasheet
,Control valve Sizing Report and Datasheet ,PSV sizing and datasheet,
Fuel Gas Scrubber Design, Fuel Gas System Design, Line Sizing and
Optimisation, Separator Sizing ,Nitrogen and Instrument Air Design ,PSV
Sizing, Laboratory Drain Tank Design, H2 Scavenger Injection Pump
Sizing, Seawater Injection Pumps Sizing (Antifoam, Scale Inhibitor,
Coagulant, O2 Scavenger, Utility Corrsion Inhibitor.
Dover Engineering Limited -Process / Flow
Assurance Engineer -
Projects: Ebendo Flowstation Debottlenecking Project (Energia)
Responsibility: Line Size Verification Report, Development of BFD,
PFD,UFD,P&ID and U&ID, HP Separator Capacity Verification Report, LP
Separator Capacity Verification Report, Heat and Material Balance
Report, Process Simulation Report, Control valve Sizing Report, Line
list, Valve List.
Okan Fire Water Project Ongoing (chevron)
Responsibility: Sizing of the Firewater pumps, Development of BFD,
PFD,UFD,P&ID and U&ID, Line list, Valve List
Obiafor / Obrikon To Indorama Eleme Fertilizer And Chemical Plant
Pipeline Project Ongoing (Indorama) 2013.
Responsibility: Feed Document Verification, Development of BFD,
PFD,UFD,P&ID and U&ID, Steady State Hydraulic Report using PipeSim, Heat
and Material Balance Report
Hydrate Study Report, Cause and Effect, Utility Load Tabulation,
Equipment Sizing and Verification, Pipe Wall Thickness Calculation Note.
Kolo Creek To Soku Pipeline Project (K2S ) (SPDC)
Responsibility: Feed Document Verification, Development of
PFD,UFD,PEFS,PSFS and Pipeline Schematic, Blowdown Study Report,
Pipeline Steady State Process Simulation Report using Pipesim, Flow
Assurance Study Report Using OLGA, Process Utility Philosophy, Shutdown
Philosophy, NAG Allocation and Metering Philosophy
Follow On Engineering To Escravos Lagos Pipeline Project Constuction
(On Going) 2012
Responsibility: Modification of PFD,UFD,PEFS,PSFS and pipeline
schematic, Line list
Valve list
Southern Swamp Gas Gathering Pipeline Project (SSGGPP ) (SPDC)
2012-2013.
Responsibility: Feed Document Verification, Blowdown Study Report,
Development of PFD,UFD,PEFS,PSFS and Pipeline Schematic, Steady State
Process Simulation Report using Honeywell Unisim. Heat and material
Balance Report using Honeywell Unisim.
Ughelli West Pipeline Project
Responsibility: Steady State Pipeline Simulation Report with Pipesim.,
Flow Assurance Report using OLGA, Line sizing Report
Installation Of Additional Heat Exchanger (CHEVRON)
Responsibility: P & ID Review, Markup, and Cadding, Rating of the
Heat Exchanger with HTRI, Line sizing
Escravos River Crossing (ERC)
Responsibility: PSV and Line sizing.(API 14E,API 526,521, GPSA etc),
Valve and Line list.
Carry out preliminary and basic engineering studies/in-house design,
Preparation of data sheets, Understudy and Review of P&ID drawings for
necessary modifications base on engineering standards (ANSI, ASME, and
API). Equipment sizing and Process simulation.
NGC/NNPC - Escravos Lagos Pipeline (ELP)
SCOPE (PHASE I): Detailed engineering design of 800MMSCFD gas
transmission pipeline from Escravos to Oben including a gas treatment
plant at warri.
SCOPE (PHASE II): Detailed Engineering Design of 1100 mmscfd Gas
transmission
pipeline from OBEN node to Itoki node (36’’X 342Km) including 3
intermediate pigging stations and associated supporting facility.
Qualifications