Image 01

 

Jaime B.
Middle Level Piping Designer

20 years work experience in the oil and gas industry, focused on Detailed Engineering Design and Construction.

Key Projects

Petroflow/National Engineering And Technical Company Nigeria - Middle level Piping Designer
Project - EGINA FPSO Project

Assigned as a Area Lead for Package 1 Module P2 and being responsible for Piping and Equipment layout in Cooling water system, Chlorination Package, Instrument Air Package, Nitrogen and Inert Gas package, Air dryer Package and Air compressor Package. Perform as a Secondary Lead in Hull Area and responsible for the routing of Drain system. Coordinate with client representative for interface location between Hull and topside piping. Attend model review and update model and incorporate client comments. Communicate with other discipline to ensure design needs are addressed, and when necessary resolve issues in a mutual respectful manner.

SBM Offshore – Kuala Lumpur, Malaysia - Sr. Piping Designer / Checker
Project - KAOMBO Project – Total E&P Angola

Assigned to develop equipment and piping arrangement at Turret area for Launcher and Receiver connected to and from riser pipe line. Work with Design Lead and discipline engineer to assure potential trend / change orders are communicated and understood to / by the design team.

RANHILL WORLEY PARSONS Sdn. Bhd. Malaysia - Sr. Piping PDMS Designer
Project Involved:

- Booster Compression Project - Carigallihess
- Tapis EOR and Rejuvenation Project (Green Field)- Exxon Mobil
- LNG Regasification Unit Island Berth & Subsea Pipeline – Petronas Gas Berhad
- LAILA Field Development Project (Green Field) – Sarawak Shell Berhad
- BETTY DRILLING PLATFORM (PCSB) (Brown Field) – Sarawak Shell Berhad
Coordinate with principal engineer for the development of pipe support standard and standard piping details as per project requirements. Responsibilities include preparation of conceptual and FEED drawing and develop into Detailed Design Drawing using PDMS software. Assigned to develop equipment and piping arrangement for Launcher and Receiver connected to and from riser pipe line. Arranged equipment and associated access platform complying safety, maintenance and mechanical handling. Responsible for the creation pipe support using MDS software for critical & non critical.

SBM Offshore – Kuala Lumpur, Malaysia - Piping Designer
Project Involved:

- Deep Panuke PFC - Encana
- Mopustor Talisman YME
- Crux FPSO Project Topsides Definition Engineering Phase – nexus energy limited
Take the responsibility of checking and back check of Isometric prior to A1 issuance. Utilize Navis Work Freedom during client model review. Prepare 3D Piping Layout & Equipment layout. To use PDMS (Plant Design Management System) computer design program in producing 3D model, extracting Isometrics and MTO. To be familiar with process plan layout, pipework design, fabrication, erection issues and safety and environmental issues. Prepare all deliverables within the time and budget constraints. Coordinate to concerned department regarding discrepancies in the model.

CBI Lummus Pte Ltd. – Singapore - Piping Designer
Project Involved:

- PETROBRAS FPSO - Prosafe
- AZURITE FDPSO - Prosafe
Responsible includes modeling of Module piping layout and equipment layout using PDMS application. Evaluates vendor equipment data and provides piping information to different disciplines. Checks integrity of the isometrics and run the clash check before isometrics are produced. Prepare pipe support and incorporate into the model prior to stress review.

FLUOR KUWAIT (K.S.C.) – Ahmadi, Kuwait - Piping Designer
Project Involved:

- Equate Modification Shuaiba Oil Pier Berth 31/32 -Kuwait National Petroleum Co. (KNPC)
- Corrosion & Scale Monitoring & Inhibitor Injection Package for SEK GC’s ( 14 Nos.) – Kuwait Oil Company (KOC)

GPC (Gulf Piping Co.) - Mussafah Ind. Area, Abu Dhabi, United Arab Emirates
Xsteel Detailer / Piping / Structural CAD Draftsman
Project Involved:

- MOLIKPAQ TIE-IN PROJECT OIL & GAS (MODULE A & B) - ABB Lummus Global BV
- KHARG ISLAND GAS GATHERING & NGL RECOVERY PROJECT
- (AB-GCP & A-GCP PLATFORM) - IOOC
- QPD FULL FIELD DEVELOPMENT EPC PACKAGE 1 – (GIP, KK1, AN7, PDP & LQP)
- HUSKY WHITE ROSE TURRET – Floating Production Storage and Offloading
- FPSO MYSTRAS MODULES OML-119 OKONO-OKPHONO-FIELDS DEVELOPMENT - Floating Production Storage and Offloading Modules
- ZAKUM GAS LIFT OPERABILITY UPGRADE – (ZADCO)
 


Qualifications

BEng Mechanical Engineering, Pablo Borbon Memorial Institute of Technology (PBMIT) Batangas, Philippines
Drafting Technology, Pablo Borbon Memorial Institute of Technology (PBMIT) Batangas, Philippines