Kamlesh S. Senior Structural Designer
25 years in onshore and offshore designing works (Power plant, Petrochemical, Refinery, Oil and Gas, Mining and FPSO).
Key Projects
Petroflow/DeltaAfrik/NETCO for Egina FPSO Project
Nigeria Lagos as Sr, Structural Designer PDMS Design and Draft.
Preparation of 3D model in PDMS and extraction of 2D drawings from DRAFT
for common/offsite facilities area Topside & piperacks and pipe
supports. And fabrication drawing checking. PDMS Structural modeling for
Topside Facilities (Primary & Secondary), & access platform. Extracting
drawings and MTO from model clash checking co-ordination with concern
disciplines.
Akersolutions – Mumbai As Sr. Structural Design
Engineer in PDMS (Design and Draft).
Involved Ekolfisk – Conocophillips , topside – primary and secondary
doing modeling and draft, also working in “PAMPA FUEL” METHONEL U.S.
BASE PROJECT in feet inches in PDMS and draft. Edvard Grieg EPC topside
project, in PDMS (Design and Draft).
KBR - Kellogg Brown & Root AT Singapore As Sr. Structural Designer Working In Gorgon Project Using PDMS modeling and draft the job involved inlet processing module with top side deck and pipe rack, equipment supports, etc.
Technip Abu Dhabi As Sr. Structural designer
AKPO Field Development Project for Total Upstream Nigeria Ltd. The FPSO
Unit is located at the AKPO field about 150km South of Port Harcourt
situated in Nigeria. Lower hull engineering and fabrication by HHI and
the Topsides module engineering by TECHNIP France. The 9 Topsides module
engineering carried out by TECHNIP Abu Dhabi.
KBR - Kellogg Brown & Root AT Singapore on AKPO
FPSO Topsides Project, Nigeria.
Preparation of 3D model in frameworks and extraction of 2D drawings for
common/offsite facilities area piperacks and pipe supports and
fabrication drawing checking. PDS Structural modeling for Topside
Facilities (Primary & Secondary), Equipment support, monorail & access
platform. Extracting drawings and MTO from model clash checking
co-ordination with concern disciplines.
Ras Laffan Liquefied Natural Gas Co. Ltd.(3)Ras
Gas Onshore Expansion Project Phase-2 (TRAIN 6 & 7) (PDS)
Preparation of 3D Model in Frameworks & Extraction of 2D views and Pipe
racks, Pipe support, Equipment Support done.
Gas Processing Facilities Project With NPCC / ADMA
(PDMS) (9569B-GPF) IN PDMS
Structural modelling and Draft for Topside Facilities, Access Platforms
and extracting drawings from model for Jackets, Topside Facilities, main
Pipe rack, Monorails, Equipment Supports, Pipe Supports, Circular
platforms & MTO. Clash Checking & Resolving clashes in PDMS and
Co-Ordination with concerned disciplines.
Nasr Phase-1 Development Project With Adma
Wellhead Towers And Manifold Tower In PDMS
Structural modeling and Draft for Topside Facilities, Access Platforms
and extracting drawings from model for Jackets, Topside Facilities,
StairCase details & MTO. Clash Checking & Resolving clashes in PDMS and
Co-Ordination with concerned disciplines.
Technip Geoproduction (M) SDN. BHD. Malaysia /
China PDS (FWP) Designer (Civil & Structural)
Deputed for 1yr 6 months at TECHNIP Shanghai, China for BASF
INTERMEDIATES THF/ Poly THF PROJECT, Located at Shanghai, China. This
Project was done in PDS and SHELL NANHAI PETROCHEMICAL Project, Located
at HUIZHOU, China. Project Contractor TECHNIP and CHIYODA Corporation.
Project Management by BECHTEL.This Project was done in PDS. PDS Modeling
& Detailed drawing for Equipment Supporting Structure, Piperacks &
Connection Details. Tank foundation details, Process str.And Clash
checking in SPR (Smart plant review) & Resolving clashes in PDS
(FRAMEWORK). 3D MicroStation Modeling for Vessel / Pump.
Qualifications
National Trade Certificate in Mech. Draughtsmanship
from I.T.I
(National Training Institute) Thane, India with First Division
Diploma in Computer Aided Design from Data pro Computers